Company in the media
06.12.2011
"HMS Group Increases R&D Capacities With New Testing Facility." OOSKAnews Water Weekly, December 6, 2011
About launching a new HMS Group's testing facility to test pumping equipment up to 14 MW. Comments of Yuriy Skrynnik, Strategy Marketing Director, HMS Group.
26.08.2011
YURIY SKRYNNIK: «Technology of the success ». Journal “Energopolis”, No. 7-8, 2011
Yuriy Skrynnik, Strategy Marketing Director of HMS Group Management Ltd., reports about pump market for thermal and nuclear power plants, as well as about HMS Group’s participation in current and future projects of thermal and nuclear energy.
22.07.2011
“HMS Group presented new developments and solutions during the exhibition and congress MIOGE 2011”. Journal “Oil Industry”, No. 7, 2011.
About the results of HMS Group’s participation in the Moscow international oil and gas exhibition and congress MIOGE 2011.
19.07.2011
VLADIMIR SOUKUP: "Irrigation will be uninterrupted. The powerful pump station was put into operation at the Yylgynagyz water channel in Turkmenistan". VODA.Magazine Journal, No. 7, 2011
Vladimir Soukup, project engineer, honorary constructor of Russia, describes the turn-key project of a water-lifting pump station at the Yylgynagyz water channel in Turkmenistan. Project highlights, applied design solutions, principle of pump station operation.
21.06.2011
ARTEM MOLCHANOV: «HMS Group has expanded the possibilities as the complex solutions' supplier for oil and gas industry. MIOGE & RPGC 2011 Daily News, № 1
Interview of Artem Molchanov, President of HMS Group for MIOGE & RPGC 2011 Daily News (Daily News of Moscow International Oil and Gas Exhibition & Russian Petroleum and Gas Congress), №1, 2011.
18.05.2011
YURIY SKRYNNIK: «Keeping pace with the times». OGU 2011 Daily News
Interview of Yuriy Skrynnik, Strategy Marketing Director of HMS Group Management Ltd. for OGU 2011 Daily News (Daily News of Oil and Gas Uzbekistan Exhibition and Conference), 18 May 2011
27.04.2011
"The turn-key construction of a water-lifting pump station at the Yylgynagyz water channel was finished in Turkmenistan". Megapaskal Journal, No.1, 2011
About the HMS Group project of the turn-key construction of a water-lifting pump station at the Yylgynagyz water channel in Turkmenistan.
12.04.2011
VLADIMIR SOUKUP: «The variant without alternative: for the improvement of water supply of Caucasian Mineral Water region’s cities it is necessary to reconstruct Malkinskiy group water supply system". VODA.Magazine Journal, No. 4, 2011
Vladimir Soukup, project engineer of Malkinsliy group water supply system, honorary constructor of Russia, describes the project of the reconstruction of Malkinskiy group water supply system, worked out by Institute Rostovskiy Vodokanalproject (HMS Group). 17 - 24 of 29 First | Prev. | 1 2 3 4 | Next | Last |
USEFUL LINKS
|